Today we walked through a modern home on the bay in South Florida. The concrete structure is complete, the interior is framed, and drywall comes next.
Walk through it

The structure
Three levels in concrete, with board-formed walls that leave the wood grain in the finish and upper floors that cantilever out over the lower level. 4Tress built the full structure.

Framing inside
Inside, the metal stud walls and the ceiling grid are up. Corridors, rooms and closets are already laid out, and the framing lines up with the concrete walls the house was built around.


Made for the view
The main rooms open to the bay through floor-to-ceiling glass. With the framing done, these rooms are ready for drywall.


What comes next
Drywall is the next stage, and we will share it here as it goes up.
4Tress Construction built the concrete structure, the framing and the stucco done so far on this home, and is now moving on to the drywall.
Building a modern home on the water? Talk to 4Tress Luxury Homes.