1. Demolition and site clearing

The old house comes down, the debris is separated and hauled away, and the lot is cleared and graded. Construction fencing and screening go up around the site to protect the neighbors and keep the work area safe.

Demolition of the old house, before the debris is hauled away, Miami Beach
Demolition of the old house, before the debris is hauled away.
The lot cleared and graded, ready for the foundation, Miami Beach
The lot cleared and graded, ready for the foundation.

2. Drilled piles

Miami Beach sits on sand and limestone with water just below the surface, so a house this size does not rest on the ground: it rests on piles. A drilling rig bores each pile to the depth set by the structural engineer, the hole is filled with concrete and a reinforcing cage is set in place. Dozens of piles carry the weight of the house down to firm ground.

Drilling rig installing the foundation piles, Miami Beach
Drilling rig installing the foundation piles.
Reinforcing steel delivered for the piles and foundation, Miami Beach
Reinforcing steel delivered for the piles and foundation.

3. Pile caps and grade beams

Once the piles cure, the excavation exposes their tops, and you can see how close the water table is. The piles are cut to elevation and tied together with pile caps and grade beams: reinforced concrete beams formed in wood, with the steel inspected before every pour. This grid is what spreads the loads of the walls and columns onto the piles.

Pile tops exposed in the excavation, with the high water table showing, Miami Beach
Pile tops exposed in the excavation, with the high water table showing.
Formwork and rebar for a pile cap, Miami Beach
Formwork and rebar for a pile cap.
Grade beams and pile caps formed and reinforced across the footprint, Miami Beach
Grade beams and pile caps formed and reinforced across the footprint.

4. The first walls

With the foundation poured, the masonry crews start the concrete block walls. Vertical reinforcing steel runs up through the block cells and is later filled with concrete, tying the walls to the foundation.

The first concrete block walls going up on the foundation, Miami Beach
The first concrete block walls going up on the foundation.
Block wall with reinforced cells ready to be filled with concrete, Miami Beach
Block wall with reinforced cells ready to be filled with concrete.

From here the structure climbs floor by floor, as you can see in our third-floor roof slab update.

4Tress Construction runs the general contracting on this home and self-performs the structure, framing, drywall and stucco.