
Big news from our Waterfront Residence in Miami Beach: the structure is complete. Every slab, column and beam is in place, up to the roof. Press play to see the 3D render of the finished home and then the job site from the drone.
From the drawings to the last beam
This is the home the structure was built for. The render shows the finished house from the rear, facing the water.

Where the build stands today
From the air you can see the full height of the house, with the bay and the city behind it. On the roof, the crew is closing the last block work and preparing for the next stages.


Topping Out: December 9, 2026
On Wednesday, December 9, 2026 we will celebrate the Topping Out with the team that built this structure. It is a tradition in construction: the moment the building reaches its full height, and a thank-you to everyone who made it happen.
Follow the full story: Pour Day and The Structure, Stage by Stage.
4Tress Construction runs the general contracting on this home and self-performs the structure, framing, drywall and stucco.
See how we build in Miami Beach: Luxury custom home builder in Miami Beach.