One day after our last update, the Wings & Rings restaurant at Flamingo Crossings keeps moving on both levels.
Light fixtures going up
With the rough electrical in place, the electrical crew has started hanging the light fixtures from a scissor lift, working under the exposed ductwork. Fixtures are set while the lift can still move freely across the floor, before the finishes and furniture come in.

Drywall finish on the walls
Below, the drywall crew continues with the finishing coats. Each joint is taped, coated and feathered out so the walls come out flat and ready for paint.

Next come the ceilings, paint and the restaurant finishes. We will keep posting as the space gets closer to opening.
4Tress Construction is the general contractor on this build-out.