Restaurant Build-Out at Flamingo Crossings: Lighting Goes Up While the Drywall Finish Continues

Wings & Rings at Flamingo Crossings, near Orlando: electricians hanging the light fixtures from a lift while the drywall crew keeps finishing the walls.

Call +1 305-588-8916[email protected]

One day after our last update, the Wings & Rings restaurant at Flamingo Crossings keeps moving on both levels.

Light fixtures going up

With the rough electrical in place, the electrical crew has started hanging the light fixtures from a scissor lift, working under the exposed ductwork. Fixtures are set while the lift can still move freely across the floor, before the finishes and furniture come in.

An electrician on a scissor lift installing light fixtures below the exposed ductwork, Flamingo Crossings, FL
An electrician on a scissor lift installing light fixtures below the exposed ductwork.

Drywall finish on the walls

Below, the drywall crew continues with the finishing coats. Each joint is taped, coated and feathered out so the walls come out flat and ready for paint.

A drywall finisher working on the taped and coated walls of the dining room, Flamingo Crossings, FL
A drywall finisher working on the taped and coated walls of the dining room.

Next come the ceilings, paint and the restaurant finishes. We will keep posting as the space gets closer to opening.

4Tress Construction is the general contractor on this build-out.