Two days after our last update, the Wings & Rings restaurant at Flamingo Crossings is moving on two levels at once.
Rough electrical overhead
Up at the ceiling, the electrical crew is working from a lift, running conduit and cable between the ducts and the structure. This rough-in has to be complete and inspected before the ceilings and soffits close, so it is one of the steps that sets the pace for everything after it.

Drywall finishing below
On the walls, the drywall crew is applying the finishing coats over the taped joints. You can see the joint compound on the panels in the photo: each coat is sanded and feathered out so the walls come out flat and ready for paint.
Next come the ceilings, paint and the restaurant finishes. We will keep posting as the space gets closer to opening.
4Tress Construction is the general contractor on this build-out.